Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Permit Application for Electrical, Plumbing, Mechanical, and Re-roof Projects

  1. OTC Permit Header
  2. SEC I: PROJECT INFORMATION
  3. SEC II: APPLICANT INFORMATION
  4. Applicant is:*
  5. SEC III: ATTACHMENTS
  6. Re-roof permit applicant must submit a complete and signed Construction and Demolition (C&D) Waste Reduction and Recycling Plan. Click here to download the C&D form.

  7. HVAC permit applicants must submit a complete and signed Certificate of Compliance (CF1R) form to demonstrate the project design and equipment are compliant with the Energy Code at time of permit application.

  8. Panel/meter upgrade project applicants must submit a picture of Southern California Edison's (SCE) Meter Spot or a copy of San Diego Gas & Electric 's (SDG&E) Work Order.

  9. If applicant is an authorized agent, a letter of authorization must be submitted at the time of application. The letter of authorization must be on company letterhead, signed and notarized.

  10. Tile re-roof project applicants must submit structural calculations if the weight of roofing materials exceeds 5.9 lbs per square feet.

  11. SEC IV: APPLICANT DECLARATION*
  12. Leave This Blank:

  13. This field is not part of the form submission.